The area to be patched must be cleaned and prepared. A high volume blower is used to create a clean surface. Any debris such as stones and loose material is removed.
Tack Coating
A tack coat of hot asphalt is applied to the area to be patched. The tack coat creates a binder and seals the base. The tack coat is applied to any holes or cracks in the base.
Fill and Compact
The Hot Asphalt Emulsion combined with aggregate is applied on top of the tack coat of the area to be patched. The pneumatic pressure at which the material is applied ensures a solid and consistent base of the area to be patched.
Dry/Top Coat
A coat of aggregate is applied on top of the Applicated Material. Traffic can proceed without any delays.